SDLC Model: Classic Waterfall Model
In a typical model, a project begins with feasibility analysis. On successfully demonstrating the feasibility of a project, the requirements analysis and project planning begins.
The design starts after the requirements analysis is complete, and coding begins after the design is complete. Once the programming is completed, the code is integrated and testing is done. On successful completion of testing, the system is installed.
After this, the regular operation and maintenance of the system takes place.
Subscribe to:
Post Comments (Atom)
2 comments:
Hi
Tks very much for post:
I like it and hope that you continue posting.
Let me show other source that may be good for community.
Source: Quality interview questions
Best rgs
David
Hello,
The Article on Classic Waterfall Model is amazing, gives detailed information about it. Thanks for Sharing the information about the waterfall Model For More information check the detail on the Waterfall Model testing here Mobile App Testing
Post a Comment